Trails

City of Altamonte Springs Festival Drive Boardwalk

GEC provided geotechnical engineering for design and construction of a 500-foot long, 14-foot wide elevated concrete boardwalk at the Festival Drive and Cranes Roost Boulevard intersection at the City of Altamonte Springs Cranes Roost Park. A retaining wall section was also designed to facilitate the grade separation between the elevated boardwalk and the existing boardwalk.